











2003
Maine Wastewater Salary Survey as conducted by the Maine Wastewater Control
Association

2003 Maine
Wastewater Rate Survey conducted by the Maine Rural
Water Association

Maine DEP Monthly
O & M Newsletter
Maine and WEF's
Operation Forum
Penobscot Watershed and Development of a TMDL
EPA Binational Toxics
Strategy
Maine Rural Water
Association
Maine Wastewater
Operator Certification
Guide
Maine Is Technology
Newsletter
Maine
Wastewater Control Association

Maine
Wastewater Engineering
Firms
| |
Lagoon Specifications

Lagoons |
No.1 |
No. 2 |
No. 3 |
Volume |
2.15 MG |
2.15 MG |
14.7 MG |
Aeration |
None |
None |
None |
System Information

Design Flow |
0.040 MGD |
Actual Flow |
0.006
MGD (Winter) 0.010 MGD (Summer) |
Discharge To |
Land
Application (30 Acres) |
Year Built |
1995 |
Design Engineers |
Wright-Pierce |
Septage Received |
No,
Holding tanks are accepted |
Collector System |
|
Staff Size |
2 Part
Time |
Number of Users |
200
Services |
Billing Software |
|
Comments |
|
Back to Lagoons in Maine
|