|












2003
Maine Wastewater Salary Survey as conducted by the Maine Wastewater Control
Association

2003 Maine
Wastewater Rate Survey conducted by the Maine Rural
Water Association

Maine DEP Monthly
O & M Newsletter
Maine and WEF's
Operation Forum
Penobscot Watershed and Development of a TMDL
EPA Binational Toxics
Strategy
Maine Rural Water
Association
Maine Wastewater
Operator Certification
Guide
Maine Is Technology
Newsletter
Maine
Wastewater Control Association

Maine
Wastewater Engineering
Firms
| |
|
Millinocket
Wastewater Treatment Facility


Lagoon
Specifications

|
Lagoon |
No. 1 |
No. 2 |
No. 3 |
|
Volume |
14.7MG |
14.7 MG |
14.7 MG |
|
Lagoon Dimensions
Top Width |
629' x 328' x 13'* |
629' x 328' x 13'* |
629' x 328' x 13'* |
|
Lagoon Dimensions
Bottom Width |
551'
x 250' |
551'
x 250' |
551'
x 250' |
|
Operating Depth |
9.5' |
9.5' |
9.5' |
|
Pond Surface Area @ 10'
of Depth |
4.35 acres |
4.35
acres |
4.35
acres |
|
Number of Aerators |
94 |
94 |
94 |
|
Aeration |
Coarse Bubble |
Coarse Bubble |
Coarse Bubble |
System Information

|
Design Flow |
2.3 MGD |
|
Actual Flow |
1.0 MGD |
|
Discharge To |
Penobscot River |
|
Year Built |
1979 |
|
Design Engineers |
Camp, Dresser, & McKee |
|
Septage Received |
Yes |
|
Collector System |
27 miles gravity sewer,
900 manholes, 4 pump stations, 3 intercepting sewers |
|
Staff Size |
3 Full Time |
|
Number of Users |
2,200 services |
|
Billing Software |
Northern Data Systems |
|
Comments |
Sludge treatment
performed on sand drying beds and then land applied. |

|
Contact |
Steven Lane |
|
Address |
62 New
York St. |
| |
Millinocket, Maine 04462 |
|
Telephone |
(207)
223 - 5028 |
Back to Lagoons in
Maine
 |
|
|