2003
Maine Wastewater Salary Survey as conducted by the Maine Wastewater Control
Association
2003 Maine
Wastewater Rate Survey conducted by the Maine Rural
Water Association
Maine DEP Monthly
O & M Newsletter
Maine and WEF's
Operation Forum
Penobscot Watershed and Development of a TMDL
EPA Binational Toxics
Strategy
Maine Rural Water
Association
Maine Wastewater
Operator Certification
Guide
Maine Is Technology
Newsletter
Maine
Wastewater Control Association
Maine
Wastewater Engineering
Firms
| |
Millinocket
Wastewater Treatment Facility
Lagoon
Specifications
Lagoon |
No. 1 |
No. 2 |
No. 3 |
Volume |
14.7MG |
14.7 MG |
14.7 MG |
Lagoon Dimensions
Top Width |
629' x 328' x 13'* |
629' x 328' x 13'* |
629' x 328' x 13'* |
Lagoon Dimensions
Bottom Width |
551'
x 250' |
551'
x 250' |
551'
x 250' |
Operating Depth |
9.5' |
9.5' |
9.5' |
Pond Surface Area @ 10'
of Depth |
4.35 acres |
4.35
acres |
4.35
acres |
Number of Aerators |
94 |
94 |
94 |
Aeration |
Coarse Bubble |
Coarse Bubble |
Coarse Bubble |
System Information
Design Flow |
2.3 MGD |
Actual Flow |
1.0 MGD |
Discharge To |
Penobscot River |
Year Built |
1979 |
Design Engineers |
Camp, Dresser, & McKee |
Septage Received |
Yes |
Collector System |
27 miles gravity sewer,
900 manholes, 4 pump stations, 3 intercepting sewers |
Staff Size |
3 Full Time |
Number of Users |
2,200 services |
Billing Software |
Northern Data Systems |
Comments |
Sludge treatment
performed on sand drying beds and then land applied. |
Back to Lagoons in
Maine
|
|
|