2003
Maine Wastewater Salary Survey as conducted by the Maine Wastewater Control
Association
2003 Maine
Wastewater Rate Survey conducted by the Maine Rural
Water Association
Maine DEP Monthly
O & M Newsletter
Maine and WEF's
Operation Forum
Penobscot Watershed and Development of a TMDL
EPA Binational Toxics
Strategy
Maine Rural Water
Association
Maine Wastewater
Operator Certification
Guide
Maine Is Technology
Newsletter
Maine
Wastewater Control Association
Maine
Wastewater Engineering
Firms
| |
Lagoon Specifications
Lagoons |
No.1 |
No. 2 |
Volume |
1.27 MG |
1.27 MG |
Aeration |
Fine Bubble |
Fine Bubble |
System Information
Design Flow |
0.11 MGD |
Actual Flow |
0.07 MGD |
Discharge To |
Little
Ossipee River |
Year Built |
1983 |
Design Engineers |
Hunter-Ballew |
Septage Received |
Yes |
Collector System |
4 miles
of gravity sewers, 2 pumping stations |
Staff Size |
2 Part
Time |
Number of Users |
600 |
Billing Software |
|
Comments |
Effluent
is pumped in a 3 mile outfall to the receiving stream. |
Back to Lagoons in Maine
|
|
|