|












2003
Maine Wastewater Salary Survey as conducted by the Maine Wastewater Control
Association

2003 Maine
Wastewater Rate Survey conducted by the Maine Rural
Water Association

Maine DEP Monthly
O & M Newsletter
Maine and WEF's
Operation Forum
Penobscot Watershed and Development of a TMDL
EPA Binational Toxics
Strategy
Maine Rural Water
Association
Maine Wastewater
Operator Certification
Guide
Maine Is Technology
Newsletter
Maine
Wastewater Control Association

Maine
Wastewater Engineering
Firms
| |
|
Howland
Wastewater Treatment Facility

Lagoon
Specifications

|
Lagoons |
No.1 |
No. 2 |
No. 3 |
No. 4 |
|
Volume |
13.5 MG |
13.6 MG |
8.3 MG |
8.6 MG |
|
Lagoon Sizes |
790' x 360' x 11' |
820' x 360' x 13' |
700' x 260' x 18' |
700' x 260' x 18' |
|
Lagoon Acreage |
6.5 acres |
6.8 acres |
4.2 acres |
4.2 acres |
|
Aeration |
None |
None |
None |
None |
Comments:
Total lagoon acreage is 21.7 or
945,252 square feet.
Design Data as follows: 300 mg/l (BOD) 350 mg/l (TSS)
System Information

|
Design Flow |
0.0161 MGD Licensed flow 0.0205
MGD |
|
Actual Flow |
0.148
MGD |
|
Discharge To |
Penobscot River |
|
Year Built |
1991 |
|
Design Engineers |
Woodard
and Curran |
|
Septage Received |
No |
|
Collector System |
8 miles
gravity sewer, 5 pump stations |
|
Staff Size |
1 Full
Time |
|
Number of Users |
476
Services |
|
Billing Software |
Trio |
|
Comments |
Also
services West Enfield (2 additional pump stations) |
Back to Lagoons in
Maine

|
|
|