![](_borders/stateseal.gif)
![Design & Operation](_derived/desopreg.htm_cmp_radius010_vbtn.gif)
![Lagoon Aeration](_derived/lagoonaeration.htm_cmp_radius010_vbtn.gif)
![Tech Papers](_derived/technotes.htm_cmp_radius010_vbtn.gif)
![Operation Articles](_derived/articles.htm_cmp_radius010_vbtn.gif)
![Lagoons In Maine](_derived/lagoons.htm_cmp_radius010_vbtn.gif)
![The Laboratory](laboratory-articles/_derived/laboratory.htm_cmp_radius010_vbtn.gif)
![Maine Lagoon News](_derived/maine-lagoon-news.htm_cmp_radius010_vbtn.gif)
![Lagoon Biology](_derived/biology.htm_cmp_radius010_vbtn.gif)
![Resources](_derived/resources.htm_cmp_radius010_vbtn.gif)
![Biosolids](_derived/biosolids.htm_cmp_radius010_vbtn.gif)
![](_borders/new.gif)
2003
Maine Wastewater Salary Survey as conducted by the Maine Wastewater Control
Association
![](_borders/new.gif)
2003 Maine
Wastewater Rate Survey conducted by the Maine Rural
Water Association
![](images/mdeplogo.gif)
Maine DEP Monthly
O & M Newsletter
Maine and WEF's
Operation Forum
Penobscot Watershed and Development of a TMDL
EPA Binational Toxics
Strategy
Maine Rural Water
Association
Maine Wastewater
Operator Certification
Guide
Maine Is Technology
Newsletter
Maine
Wastewater Control Association
![Maine WasteWater Control Association](_borders/lagoon-mwwca-logo.gif)
Maine
Wastewater Engineering
Firms
| |
Canton
Wastewater Treatment Facility
![Canton Wastewater Treatment Facility](images/cantonplant.gif)
Lagoon Specifications
![aerated lagoons](images/linebar.gif)
Lagoons |
No.1 |
No. 2 |
No. 3 |
No. 4 |
Volume |
3.0 MG |
4.3 MG |
7.1 MG |
7.1 MG |
Lagoon Acreage |
1.5 acres |
2.0 acres |
1.25 acres |
1.25 acres |
Lagoon Depth |
9 feet |
11 feet |
9 feet |
9 feet |
Aeration |
None |
None |
None |
None |
Comments:
Total lagoon volume is 21.5 MG. Total lagoon acreage is 6.5
or 283,140 square feet. Design Data as follows: 270 mg/l (BOD)
320 mg/l (TSS). |
System Information
![Canton Maine](images/linebar.gif)
Design Flow |
.050 MGD |
Actual Flow |
.020 MGD |
Discharge To |
Whitney Brook |
Year Built |
1985 |
Design Engineers |
Woodard and Curran |
Septage Received |
No |
Collector System |
4 miles gravity sewer, 2 pump stations |
Staff Size |
1 Part Time |
Number of Users |
60 services |
Comments |
This is a hold and release plant.
Discharge is limited to periods of high flow in the receiving
stream. |
Back to Lagoons in
Maine
![canton](images/upbut.jpg)
|
|
|